Topic summary
97%1 analyzed article/video647 analyzed words
BS Summary: These Municipal Infrastructure results contain 24 faulty reasoning types, including Attempt to Sell a Product or Service, Optimism Bias, and Framing Effect, with Appeal to Emotion as the most egregious example at 34.1% saturation with 662 hits. Analysis detected 2,551 faulty-reasoning hits from 1,941 analyzed words across 1 article, generating a BS Score of 5.5% and a BS Rank of 79% (3,373 of 15,769 topics). This Municipal Infrastructure is worse (more manipulative) than 78.60% of the peer group.
Municipal Infrastructure
Topic details
Total words: 1,941
Article count: 1
Authors
Loading chart...
Attribute Prevalence (Top 48)
Municipal Infrastructure attribute prevalence percentages (biases/fallacies), sorted highest to lowest.
Loading chart...
Municipal Infrastructure vs sitewide
Municipal Infrastructure attribute percentages, with an overlaid sitewide baseline for those same attributes.

Analyzed articles and videos