Topic summary
6%1 analyzed article/video1,414 analyzed words
BS Summary: These Construction Delays results contain 18 faulty reasoning types, including Availability Heuristic, Appeal to Authority, and Hasty Generalization, with Optimism Bias as the most egregious example at 4.8% saturation with 274 hits. Analysis detected 1,146 faulty-reasoning hits from 5,656 analyzed words across 1 article, generating a BS Score of 1.1% and a BS Rank of 6% (20,274 of 21,510 topics). This Construction Delays is better (less manipulative) than 94.30% of the peer group.
Construction Delays
Topic details
Loading chart...
Attribute Prevalence (Top 48)
Construction Delays attribute prevalence percentages (biases/fallacies), sorted highest to lowest.
Loading chart...
Construction Delays vs sitewide
Construction Delays attribute percentages, with an overlaid sitewide baseline for those same attributes.