Topic summary
2%1 analyzed article/video237 analyzed words
BS Summary: These Construction Contract results contain 4 faulty reasoning types, including Post Hoc (False Cause), Optimism Bias, and Framing Effect, with Status Quo Bias as the most egregious example at 3.7% saturation with 35 hits. Analysis detected 96 faulty-reasoning hits from 948 analyzed words across 1 article, generating a BS Score of 2.5% and a BS Rank of 50% (10,571 of 21,125 topics). This Construction Contract is worse (more manipulative) than 50.00% of the peer group.
Construction Contract
Topic details
Loading chart...
Attribute Prevalence (Top 48)
Construction Contract attribute prevalence percentages (biases/fallacies), sorted highest to lowest.
Loading chart...
Construction Contract vs sitewide
Construction Contract attribute percentages, with an overlaid sitewide baseline for those same attributes.