Keyword summary
0%1 analyzed article/video1,090 analyzed words
BS Summary: These Military Contractor results contain 30 faulty reasoning types, including Negativity Bias, Biased Writer Voice, and In-Group Bias, with Appeal to Emotion as the most egregious example at 15.9% saturation with 695 hits. Analysis detected 4,102 faulty-reasoning hits from 4,360 analyzed words across 1 article, generating a BS Score of 3.1% and a BS Rank of 56% (12,700 of 28,615 keywords). This Military Contractor is worse (more manipulative) than 55.60% of the peer group.
Military Contractor
Keyword ranking list
PercentileKeywordBS Score
0%Self-Driving Cars1%
0%Self Driving Cars1%
0%Bastille Day1%
0%Anthony Broadwater1%
0%Alice Sebold1%
56%Military Contractor (selected)4%
100%Rad Power Bikes60%
100%Mike Lewis60%
100%Joni Balter60%
100%Lawrence O'donnell69%
100%Bondi Beach Shooting70%
Keyword details
Total words: 4,360
Article count: 1
Authors
Loading chart...
Attribute Prevalence (Top 48)
Military Contractor attribute prevalence percentages (biases/fallacies), sorted highest to lowest.
Loading chart...
Military Contractor vs sitewide
Military Contractor attribute percentages, with an overlaid sitewide baseline for those same attributes.

Analyzed articles and videos