Keyword summary
â 0%1 analyzed article/video1,821 analyzed words
BS Summary: These Defence Contractors results contain 27 faulty reasoning types, including Appeal to Authority, Confirmation Bias, and Post Hoc (False Cause), with Availability Heuristic as the most egregious example at 8.2% saturation with 595 hits. Analysis detected 4,554 faulty-reasoning hits from 7,284 analyzed words across 1 article, generating a BS Score of 2.3% and a BS Rank of â 36% (24,323 of 37,536 keywords). This Defence Contractors is better (less manipulative) than 64.80% of the peer group.
Defence Contractors
Keyword details
Loading chart...
Attribute Prevalence (Top 48)
Defence Contractors attribute prevalence percentages (biases/fallacies), sorted highest to lowest.
Loading chart...
Defence Contractors vs sitewide
Defence Contractors attribute percentages, with an overlaid sitewide baseline for those same attributes.