Keyword summary
81%1 analyzed article/video504 analyzed words
BS Summary: These Cost Overruns results contain 27 faulty reasoning types, including Biased Writer Voice, Framing Effect, and Hasty Generalization, with Negativity Bias as the most egregious example at 17.7% saturation with 357 hits. Analysis detected 2,677 faulty-reasoning hits from 2,016 analyzed words across 1 article, generating a BS Score of 4.9% and a BS Rank of 80% (7,694 of 38,276 keywords). This Cost Overruns is worse (more manipulative) than 79.90% of the peer group.
Cost Overruns
Keyword details
Loading chart...
Attribute Prevalence (Top 48)
Cost Overruns attribute prevalence percentages (biases/fallacies), sorted highest to lowest.
Loading chart...
Cost Overruns vs sitewide
Cost Overruns attribute percentages, with an overlaid sitewide baseline for those same attributes.