Keyword summary
45%1 analyzed article/video312 analyzed words
BS Summary: These Contractor Kickback 30th Stree Station Renovation results contain 13 faulty reasoning types, including Negativity Bias, Biased Writer Voice, and Indoctrination, with Appeal to Emotion as the most egregious example at 19.8% saturation with 185 hits. Analysis detected 747 faulty-reasoning hits from 936 analyzed words across 1 article, generating a BS Score of 6.1% and a BS Rank of 86% (4,525 of 31,098 keywords). This Contractor Kickback 30th Stree Station Renovation is worse (more manipulative) than 85.50% of the peer group.
Contractor Kickback 30th Stree Station Renovation
Keyword ranking list
PercentileKeywordBS Score
0%Bastille Day1%
0%Self-Driving Cars1%
0%Self Driving Cars1%
0%Borders1%
0%French Revolution1%
86%Contractor Kickback 30th Stree Station Renovation (selected)7%
100%Rad Power Bikes60%
100%Mike Lewis60%
100%Joni Balter60%
100%Lawrence O'donnell69%
100%Bondi Beach Shooting70%
Keyword details
Total words: 936
Article count: 1
Authors
Loading chart...
Attribute Prevalence (Top 48)
Contractor Kickback 30th Stree Station Renovation attribute prevalence percentages (biases/fallacies), sorted highest to lowest.
Loading chart...
Contractor Kickback 30th Stree Station Renovation vs sitewide
Contractor Kickback 30th Stree Station Renovation attribute percentages, with an overlaid sitewide baseline for those same attributes.

Analyzed articles and videos