Keyword summary
0%1 analyzed article/video
BS Summary: These Contractor results contain 25 faulty reasoning types, including Politically Left Leaning Bias, Negativity Bias, and Post Hoc (False Cause), with Biased Writer Voice as the most egregious example at 19.4% saturation with 314 hits. Analysis detected 2,323 faulty-reasoning hits from 1,617 analyzed words across 1 article, generating a BS Score of 0% and a BS Rank of 0% (0 of 28,665 keywords). This Contractor is better (less manipulative) than 100.00% of the peer group.
Contractor
Keyword ranking list
PercentileKeywordBS Score
0%Self-Driving Cars1%
0%Self Driving Cars1%
0%Bastille Day1%
0%Anthony Broadwater1%
0%Alice Sebold1%
100%Rad Power Bikes60%
100%Mike Lewis60%
100%Joni Balter60%
100%Lawrence O'donnell69%
100%Bondi Beach Shooting70%
0%Contractor (selected)0%
Keyword details
Total words: 1,617
Article count: 1
Authors
Loading chart...
Attribute Prevalence (Top 48)
Contractor attribute prevalence percentages (biases/fallacies), sorted highest to lowest.
Loading chart...
Contractor vs sitewide
Contractor attribute percentages, with an overlaid sitewide baseline for those same attributes.

Analyzed articles and videos