Keyword summary
4%1 analyzed article/video259 analyzed words
BS Summary: These Construction Timeline results contain 12 faulty reasoning types, including Anchoring Bias, Negativity Bias, and Post Hoc (False Cause), with Appeal to Authority as the most egregious example at 8.8% saturation with 68 hits. Analysis detected 295 faulty-reasoning hits from 777 analyzed words across 1 article, generating a BS Score of 3.2% and a BS Rank of 57% (16,161 of 37,536 keywords). This Construction Timeline is worse (more manipulative) than 56.90% of the peer group.
Construction Timeline
Keyword details
Loading chart...
Attribute Prevalence (Top 48)
Construction Timeline attribute prevalence percentages (biases/fallacies), sorted highest to lowest.
Loading chart...
Construction Timeline vs sitewide
Construction Timeline attribute percentages, with an overlaid sitewide baseline for those same attributes.